Design to production order in 32 days
From design to production order in 32 days.
At a glance
- TGA-listed medicine
- Built on KSM-66®, a clinically studied ashwagandha extract
- 32 days, design to production order
The brand
A founder-led start-up.
The challenge
A complex herbal formula built around branded KSM-66 ashwagandha, needed on a tight timeline.
What we built
The formula, an evidence package covering more than 13 ingredients, the TGA listing and a long-term stability program.
Manufacturing and delivery
We managed manufacturing through to delivery.
The result
- From design to production order in 32 days.
Related case studies
